Gas bills in Sindh and Balochistan open on SSGC’s own page with a 10 digit customer number. Paste yours above, then work out the next bill below with the pressure factor SSGC itself uses.
SSGC’s own short clip shows the digital bill. It lasts under half a minute.

SSGC bill calculation with pressure and GCV
The pressure factor
SSGC does not bill the gas exactly as the meter reads it. Its domestic bill calculator first corrects the volume for line pressure, using a pressure correction factor.
| Step | Formula | At 0.25 psig |
|---|---|---|
| Pressure factor (PCF) | (pressure + 14.65) / 14.65 | 1.0171 |
| Standard volume | metered volume x PCF | 100 cubic metres becomes 102 |
| MMBTU | standard hm3 x GCV / 281.7385 | 1.02 hm3 is 3.62 MMBTU at GCV 1000 |
SSGC’s calculator starts at 0.25 psig and a GCV of 1000. Your own bill prints both figures, so type them into the calculator above.
From cubic metres to MMBTU
The meter counts cubic metres. One hm3 is 100 of them. OGRA prices gas per MMBTU, a unit of heat, so the GCV converts volume into heat. A higher GCV means more heat in each cubic metre, and a bigger bill for the same reading.
Worked example for 1 hm3
A non protected home reads exactly 1.00 hm3 on the meter this month.
- Pressure factor 1.0171 raises it to 1.02 hm3.
- That crosses the 1 hm3 slab edge, so the last 0.02 hm3 is charged at Rs 1,450 per MMBTU.
- The first 1 hm3 keeps the Rs 1,250 rate through the preceding slab benefit.
- Gas charges come to about Rs 4,540, plus Rs 1,500 fixed charge and Rs 40 meter rent.
- Sales tax of 18% brings the bill to about Rs 7,174.
Without the pressure factor, the same reading would be about Rs 7,053. The difference is small, but it moves readings near a slab edge into the next slab.
SSGC gas bill for 0.25 to 3 hm3
Protected homes
All totals below use SSGC’s starting values of 0.25 psig and GCV 1000, OGRA’s rates from 1 July 2025, Rs 40 meter rent and 18% sales tax.
| On the meter | Billed as | Gas charges | Fixed charge | Estimated bill |
|---|---|---|---|---|
| 0 hm3 | 0 | Rs 0 | Rs 600 | Rs 755 |
| 0.25 hm3 | 0.25 hm3 | Rs 177 | Rs 600 | Rs 965 |
| 0.5 hm3 | 0.51 hm3 | Rs 454 | Rs 600 | Rs 1,291 |
| 0.85 hm3 | 0.86 hm3 | Rs 962 | Rs 600 | Rs 1,890 |
The protected table ends at 0.9 hm3 after the pressure correction. At 0.25 psig that is about 0.88 hm3 on the meter. SSGC’s own calculator tells a protected customer to switch to the non protected sheet above that.
Non protected homes
| On the meter | Billed as | Gas charges | Fixed charge | Estimated bill |
|---|---|---|---|---|
| 0 hm3 | 0 | Rs 0 | Rs 1,500 | Rs 1,817 |
| 0.5 hm3 | 0.51 hm3 | Rs 1,228 | Rs 1,500 | Rs 3,266 |
| 1 hm3 | 1.02 hm3 | Rs 4,540 | Rs 1,500 | Rs 7,174 |
| 1.47 hm3 | 1.50 hm3 | Rs 7,010 | Rs 1,500 | Rs 10,089 |
| 1.48 hm3 | 1.51 hm3 | Rs 7,787 | Rs 3,000 | Rs 12,776 |
| 2 hm3 | 2.03 hm3 | Rs 13,839 | Rs 3,000 | Rs 19,917 |
| 3 hm3 | 3.05 hm3 | Rs 35,813 | Rs 3,000 | Rs 45,847 |
One hundredth of an hm3 on the meter, from 1.47 to 1.48, adds about Rs 2,687. The fixed charge doubles and the rate jumps to Rs 1,900 at the same moment.
Our calculation from OGRA's notification effective 1 July 2025, with SSGC's pressure factor at 0.25 psig and GCV 1000. Excludes arrears, surcharge and gas supply deposit top ups.
Where SSGC’s own calculator differs
We tested SSGC’s online calculator on 13 November 2026. Its slab rates match OGRA’s current table. Its fixed charges do not: it still loads Rs 400 for protected homes, and Rs 1,000 or Rs 2,000 for non protected homes.
| Category | SSGC calculator | OGRA from 1 July 2025 |
|---|---|---|
| Protected | Rs 400 | Rs 600 |
| Non protected, up to 1.5 hm3 | Rs 1,000 | Rs 1,500 |
| Non protected, above 1.5 hm3 | Rs 2,000 | Rs 3,000 |
So its totals come out lower than a real bill. For 1 hm3 non protected, it shows about Rs 6,584, against about Rs 7,174 on OGRA’s current fixed charge.
Sui southern gas rates by slab
Protected slab rates
OGRA’s notification of 29 June 2025 sets one domestic price table for SSGC and SNGPL, in force since 1 July 2025. The government kept consumer prices unchanged for 2026 to 2027, and OGRA has notified no newer domestic price.
| Monthly use | Rs per MMBTU |
|---|---|
| Up to 0.25 hm3 | 200 |
| Up to 0.5 hm3 | 250 |
| Up to 0.6 hm3 | 300 |
| Up to 0.9 hm3 | 350 |
A home is protected when its average use over the last four winter months, November to February, is 0.9 hm3 or less. This winter’s readings decide next year’s category.
Non protected slab rates
| Monthly use | Rs per MMBTU |
|---|---|
| Up to 0.25 hm3 | 500 |
| Up to 0.6 hm3 | 850 |
| Up to 1 hm3 | 1,250 |
| Up to 1.5 hm3 | 1,450 |
| Up to 2 hm3 | 1,900 |
| Up to 3 hm3 | 3,300 |
| Up to 4 hm3 | 3,800 |
| Above 4 hm3 | 4,200 |
Each bill gets the benefit of one slab below yours, except above 4 hm3. There every unit is billed at Rs 4,200.
Fixed charge, meter rent and GST
| Charge | Amount |
|---|---|
| Fixed charge, protected | Rs 600 a month |
| Fixed charge, non protected up to 1.5 hm3 | Rs 1,500 a month |
| Fixed charge, non protected above 1.5 hm3 | Rs 3,000 a month |
| Meter rent, normal domestic meter (G4 or G1.6) | Rs 40 a month |
| General sales tax | 18% |
The fixed charge is due even in a month with no gas used. That is why a quiet summer month still costs a non protected home about Rs 1,817.
SSGC duplicate bill online
Where the 10 digit customer number is
Every SSGC bill prints a 10 digit customer number. SSGC’s bill page rejects anything shorter, and a name or CNIC search does not exist.
This is the main difference from SNGPL in the north, whose consumer number has 11 digits. A number from one company will not open on the other’s page.
The security check on SSGC’s page
SSGC’s Pay or Download Bill page asks for a Google security tick before it shows the bill. No outside site can skip that step for you. The box at the top of this page checks your digits, copies them and opens that page, so you only paste and tick.
The same page offers online payment and a link to register for the email bill.
SSGC Customer Connect app
Customer Connect is SSGC’s own app. It shows and pays the bill, and takes complaints, gas theft reports and connection requests.
Lost every old bill
Visit your billing zone or customer facilitation centre with your original CNIC and the address of the connection. Ask the staff there for the customer number.
Gas timings in Karachi this winter
Cooking hours for homes
SSGC’s winter notice, posted on its website in November 2026, sets gas for homes around meal times.
| Meal | Gas supply hours |
|---|---|
| Breakfast | 6:30 am to 9:00 am |
| Lunch | 12:00 noon to 2:30 pm |
| Dinner | 6:00 pm to 9:00 pm |
That is eight hours a day. SSGC says the plan follows Government of Pakistan directives and puts domestic customers first.
Low pressure at home
Never fit a compressor on the gas line. It pulls gas from neighbours and raises the risk of fire. Close every tap when supply stops, so gas does not escape when it returns.
Pay SSGC bill
Banks, kiosks and wallets
SSGC lists these channels on its payment page.
| Channel | Examples |
|---|---|
| Internet banking and ATMs | ABL, Alfalah, Askari, Bank Al Habib, HBL, MCB, Meezan, UBL and others |
| Bank call centres | ABL, Alfalah, Faysal, HMB, MCB, UBL |
| Retail shops and agents | Easypaisa, HBL Express, UBL Omni, Mobicash, eSahulat |
| Mobile payments | Easypaisa, UBL Omni, Mobicash, Soneri |
| Payment kiosks | PSO, eSahulat |
| Credit cards | Alfalah, MCB, Standard Chartered, UBL |
Late payment and gas supply deposit
SSGC charges a 10% late payment surcharge on the current bill for homes, according to its FAQ. The bill prints the higher amount payable after the due date.
The gas supply deposit equals three months of your average bill. SSGC reviews it every year and adds any shortfall to the bill, so a heavier winter can raise it.
SSGC complaint number 1199
Where to complain
| Need | Channel |
|---|---|
| Gas leakage, no gas, low pressure | 1199, at any hour |
| Billing complaint | 1199, (021) 9902 1000 or the online form |
| App complaint | SSGC Customer Connect |
| info@ssgc.com.pk |
SSGC also publishes a list of complaint types with estimated resolution times on its website.
Smell of gas at home
Do not switch any light or fan on or off. Close the meter valve, open doors and windows, leave the house and call 1199 from outside. The pipe after the meter is the customer’s responsibility, so get any leak inside the house repaired.
Meter stopped or running slow
SSGC replaces a meter that stops registering gas. The months it was stuck are billed from the new meter’s use. A meter found slow in lab testing is billed for the volume the test shows, so report a frozen reading early.
SSGC new gas connection
RLNG only for new homes
New domestic connections on SSGC’s network are available only under the RLNG tariff. The federal government stopped new connections on local system gas in September 2025. RLNG is priced each month by OGRA and costs more per unit than most of the slab table above.
Charges in Sindh and Balochistan
SSGC’s RLNG connection page lists these charges, marked subject to change.
| Plot size | Sindh | Balochistan |
|---|---|---|
| Up to 10 marla or 300 sq yd | Rs 22,725 | Rs 21,725 |
| Above 10 marla or 300 sq yd | Rs 24,450 | Rs 23,450 |
Both include a Rs 20,000 gas supply deposit. Sindh adds Rs 1,000 stamp duty. Pipe fitting inside the house is extra and paid by you.
Track the application
Apply online with your nearest neighbour’s customer and meter numbers, then take a copy to the sales office or customer facilitation centre. SSGC sends status by SMS and in the Customer Connect app. If no SMS arrives within a week, email info.sales@ssgc.com.pk.
Update CNIC on your SSGC gas bill
Why SSGC is asking
SSGC’s bill page carries a notice, citing government and FBR directives, asking every customer to update the CNIC on the gas bill. Its FAQ warns that the update avoids disconnection.
How to do it
Take your original CNIC to the nearest billing zone or customer facilitation centre.
SSGC and SNGPL compared
Two companies, one price table
| Detail | SSGC | SNGPL |
|---|---|---|
| Area | Sindh and Balochistan | Punjab, KP, Islamabad, AJK |
| Customer number | 10 digits | 11 digits |
| Online bill check | Google security tick | Typed captcha |
| Official estimator asks for | Readings, pressure and GCV | Readings and GCV |
| Domestic slab rates | OGRA, 1 July 2025 | Same table |
North of Sindh, use the SNGPL bill check instead. Karachi’s electricity bill comes from K-Electric, and the rest of the bills section covers other companies.
SSGC at a glance
- 3.2 million
- Customers, investor presentation
- 50,000 km
- Distribution network, about
- 1199
- 24 hour helpline
- 10 digits
- Customer number
Where these numbers come from
Slab rates, fixed charges and the protected rule are from OGRA’s notification of 29 June 2025, effective 1 July 2025, checked on 13 November 2026. The pressure factor, starting GCV, meter rent and the calculator’s old fixed charges come from SSGC’s online calculator, read the same day. The customer number format and security check were tested on SSGC’s bill page. Gas timings are from SSGC’s November 2026 winter notice. Payment channels, connection charges, the late surcharge, deposit and complaint channels are from ssgc.com.pk. The customer count and network length are from SSGC’s investor presentation on the PSX. Sample bills are our own calculation.

Frequently asked questions
How can I check my SSGC bill online?
Type the 10 digit customer number from an old gas bill into the box at the top of this page. It copies the number and opens SSGC's official Pay or Download Bill page, where you paste it, tick the security box and open the bill.
How is the SSGC gas bill calculated?
SSGC first raises the metered gas by a pressure factor, then converts it to MMBTU with the GCV on the bill. It applies OGRA's slab rate, adds the fixed charge and Rs 40 meter rent, and puts 18% sales tax on top.
How much is the SSGC bill for 1 hm3 of gas?
For a non protected home, 1 hm3 on the meter comes to about Rs 7,174 with tax, at SSGC's own starting values of 0.25 psig pressure and GCV 1000. Your bill uses the pressure and GCV printed on it, so expect a small difference.
What is the SSGC helpline number?
SSGC's helpline is 1199 and it works around the clock, every day of the year. Use it for gas leakage, no gas, low pressure and billing complaints. The landline (021) 9902 1000 and SSGC's online complaint form also work.
Can I get a new SSGC gas connection in 2026?
SSGC's website accepts new domestic applications only under the RLNG tariff. For a plot up to 10 marla in Sindh, the charges listed are Rs 22,725, mostly a Rs 20,000 gas supply deposit, plus your own pipe fitting.
What are the gas timings in Karachi this winter?
SSGC's winter notice gives homes gas during cooking hours: 6:30 am to 9 am, 12 noon to 2:30 pm and 6 pm to 9 pm. It says this follows Government of Pakistan directives for managing winter gas load.
Last updated:


