Quetta, Turbat and Zhob all get their bills from the same PITC service. Enter the 14 digit reference number above and this month’s QESCO bill opens, then price any month’s units below.
NEPRA’s own channel posted this four minute explainer in March 2020. It reads a distribution company bill block by block, the same layout a QESCO bill uses.

QESCO duplicate bill by reference number
The account numbers on a QESCO bill do not change from month to month. Any old bill, even a crumpled one, is enough to pull up the current month.
Reference number and the U or R letter
The reference number sits near the top left of the bill. It has 14 digits: a 2 digit batch, a 5 digit subdivision code and a 7 digit connection number. A single letter follows, U for an urban feeder or R for a rural one.
Village meters are usually on rural feeders. If an R meter is searched with U, PITC returns nothing. Flip the letter before you assume the number is wrong.
Customer ID when the number is faded
The Customer ID is printed on the same bill. Choose that tab in the box above and the same account opens. It helps when the reference number has worn off a bill kept in a wallet.
Saving and printing the copy
Save a PDF for bank counters and records. Save an image if you only need to send it on WhatsApp. Print the full page so the barcode scans.
| You need | Use |
|---|---|
| Pay at a bank counter | Printed PDF |
| Send to a landlord or family | Image |
| Proof in a billing dispute | PDF with the month in the file name |
| A bill that shows last month | Wait a day for your batch to upload |
QESCO Light app and SMS 8118
QESCO Light on Android
QESCO’s complaint poster points customers to QESCO Light, a PITC app on Google Play. Its last update was in April 2022, so the web bill above is the more reliable route.
Call 118 or send an SMS to 8118
The same QESCO poster lists two complaint routes: call 118 or text 8118. Both feed PITC’s complaint system. Write down the complaint number you are given.
QESCO bill calculator for winter heater months
Quetta’s winter changes bills more than its summer does. A heater running every evening can push a small home past 200 units, and that single month ends protected status.
Up to 200 units, protected
| Units | Load | Estimated bill | Per unit |
|---|---|---|---|
| 100 | 1 kW | Rs 1,871 | Rs 18.71 |
| 150 | 2 kW | Rs 3,306 | Rs 22.04 |
| 200 | 2 kW | Rs 4,270 | Rs 21.35 |
Same 200 units without protection
A home that crossed 200 units in any of the last six months pays the unprotected rate on every unit. The same 200 units on a 2 kW load then cost about Rs 8,974. That is more than double.
| Units | Load | Estimated bill | Per unit |
|---|---|---|---|
| 200 | 2 kW | Rs 8,974 | Rs 44.87 |
| 250 | 2 kW | Rs 12,395 | Rs 49.58 |
| 300 | 2 kW | Rs 14,709 | Rs 49.03 |
| 400 | 3 kW | Rs 21,512 | Rs 53.78 |
| 600 | 4 kW | Rs 35,992 | Rs 59.99 |
Our calculation from NEPRA S.R.O. 279(I)/2026, 1501(I)/2026 and 2094(I)/2026. Excludes income tax, arrears and meter rent.
A 600 unit bill, line by line
| Line on the bill | Amount |
|---|---|
| Energy, 600 units at Rs 40.22 | Rs 24,132 |
| Fixed charge, Rs 675 per kW for 4 kW | Rs 2,700 |
| FC surcharge, Rs 3.23 per unit | Rs 1,938 |
| Quarterly adjustment, Rs 0.5194 per unit | Rs 312 |
| Fuel adjustment, Rs 2.3673 per unit | Rs 1,420 |
| GST at 18% | Rs 5,490 |
| Estimated total | Rs 35,992 |
QESCO per unit rate for November 2026
QESCO bills homes on the uniform national tariff in S.R.O. 279(I)/2026, in force since 12 February 2026. A Quetta unit costs what a Hyderabad unit costs on a HESCO bill.
Lifeline and protected slabs
| Group | Units | Rate per unit | Fixed charge per kW |
|---|---|---|---|
| Lifeline | Up to 50 | Rs 3.95 | None |
| Lifeline | 51 to 100 | Rs 7.74 on all units | None |
| Protected | 1 to 100 | Rs 10.54 | Rs 200 |
| Protected | 101 to 200 | Rs 13.01 | Rs 300 |
Protected homes stay at or under 200 units in each of the last six months. They alone get the benefit of the lower slab.
Unprotected slabs
| Units in the month | Rate on every unit | Fixed charge per kW |
|---|---|---|
| 1 to 100 | Rs 22.44 | Rs 275 |
| 101 to 200 | Rs 28.91 | Rs 300 |
| 201 to 300 | Rs 33.10 | Rs 350 |
| 301 to 400 | Rs 36.46 | Rs 400 |
| 401 to 500 | Rs 38.95 | Rs 500 |
| 501 to 600 | Rs 40.22 | Rs 675 |
| 601 to 700 | Rs 41.85 | Rs 675 |
| Above 700 | Rs 47.20 | Rs 675 |
Time of use from 5 kW
A sanctioned load of 5 kW or more is billed on a time of use meter. Peak units cost Rs 46.85 and off peak units Rs 34.53. The fixed charge is Rs 675 per kW.
FCA, quarterly adjustment and tax on the QESCO bill
Fuel adjustment of Rs 2.3673
NEPRA notified the September 2026 fuel adjustment on 6 November 2026. It is charged on the November bill against the units you used in September. Lifeline homes do not pay it.
Quarterly adjustment ends with November
The quarterly adjustment of Rs 0.5194 per unit runs on the September, October and November 2026 bills. The FC surcharge of Rs 3.23 per unit repays the circular debt loan.
GST and income tax
GST at 18% applies to energy, the fixed charge and every adjustment. Bills above Rs 25,000 can carry advance income tax for anyone off the Active Taxpayers List. The PTV fee and electricity duty no longer appear on home bills.
QESCO complaint number and offices in Quetta
Numbers QESCO publishes
QESCO’s customer services page lists these numbers and addresses.
| Purpose | Contact |
|---|---|
| Power failure or billing complaint | Call 118, or SMS 8118 |
| Head office complaint and customer services centre | 081 9201445 |
| Electricity theft, toll free | 0800 84338 |
Two customer centres
The head office centre is on Main Zarghoon Road, beside the CCPO Office, Quetta Cantt. The city centre is on Main Liaquat Bazaar, first floor of Fire Brigade Plaza, opposite City Police Station. Take an old bill and your CNIC to either.
When QESCO does not fix it
An unresolved billing dispute can go to NEPRA’s Asaan Approach app, which takes complaints against every distribution company. Our helplines page has other federal and provincial numbers.
Where QESCO supplies in Balochistan
All districts except Lasbela
QESCO says it covers Balochistan except District Lasbela, about 43% of Pakistan’s land area. K-Electric supplies Uthal, Vindar and Bela. Homes in that belt should check the company name on the bill before searching.
Operation circles and divisions
QESCO’s phone directory lists operation circles for Central, Pishin, Loralai, Sibi, Khuzdar and Makran. Its operation divisions include City, Sariab and Zarghoon in Quetta, plus Gwadar, Turbat, Kalat, Naseerabad, Noushki, Qilla Saifullah and Qilla Abdullah.
QESCO network in figures
The company’s About page gives the size of the network, without a date. QESCO’s home page calls it the company with the fewest customers among the distribution companies.
- 530,520
- Customers
- 501
- 11 kV feeders
- 39,794
- Distribution transformers
- 40,977 km
- Distribution lines
Agricultural tubewells and the solar switch
Rs 2 million per connection
Federal and provincial governments are moving Balochistan’s farm tubewells off the grid onto solar. In June 2026 QESCO said all connections in the programme had been cut. Registered farmers were paid Rs 2 million per connection, as reported then.
Equipment has to go back
QESCO field teams removed transformers, poles and cables from the converted wells. Balochistan’s Agricultural Solarisation and Electricity Theft Prevention Law 2025 requires beneficiaries to return that equipment, or face legal action.
What it means for a home bill
Farm tubewells are billed on a separate agricultural tariff. The switch to solar does not change the domestic slab rates shown above.
QESCO recovery and load shedding
Lowest recovery of any company
NEPRA’s performance report for FY 2024 to 2025, published in February 2026, put QESCO’s recovery at 38.7%. That was the lowest of all companies, up from 31.79% a year earlier. The value of its distribution losses was Rs 52.41 billion.
NEPRA performance evaluation report for distribution companies, FY 2024 to 2025, as reported on 26 February 2026.
Why paying homes still face cuts
Load shedding is planned feeder by feeder on losses and recovery. A feeder with low payment gets longer cuts, even for the homes on it that pay on time.
New QESCO connection and net metering
Documents for a new meter
QESCO asks for a copy of your CNIC, proof of ownership and a signed conditions of supply form. A tenant needs the owner’s permission on stamp paper. Requests go through the ENC portal, as our new connection guide explains. NEPRA’s latest review found QESCO late on 4.74% of connections.
Charges QESCO lists
| Connection | Charge on QESCO’s page |
|---|---|
| Single phase home | Rs 3,000, payable as Rs 300 upfront and nine instalments of Rs 300 on request |
| Three phase, service line up to 40 m | Rs 8,000 |
| Three phase, 40 to 100 m | Rs 8,000 plus Rs 140 per metre beyond 40 m |
| Three phase, 100 to 160 m | Rs 16,400 plus Rs 220 per metre beyond 100 m |
| Three phase, 160 to 280 m | Rs 29,600 plus Rs 250 per metre beyond 160 m |
Solar net metering papers
QESCO’s net metering page posts its SOP, an application checklist, the interconnection flow chart and a feeder list. New solar users fall under NEPRA’s 2026 prosumer rules. Our solar scheme guide covers subsidised panels.
Paying the QESCO bill before the due date
Bank apps and wallets
Bank apps and mobile wallets list QESCO under electricity bills. Enter the reference number and match the month and amount before you pay.
10% after the due date
A late payment surcharge of 10% of the bill before taxes is added after the due date.
| Sample bill | By due date | After due date |
|---|---|---|
| 200 units, protected, 2 kW | Rs 4,270 | Rs 4,632 |
| 250 units, unprotected, 2 kW | Rs 12,395 | Rs 13,445 |
| 600 units, unprotected, 4 kW | Rs 35,992 | Rs 39,042 |
Gas in Quetta is billed separately by SSGC. Our SSGC bill page opens that bill.
Sources and last check
Slab rates and fixed charges come from S.R.O. 279(I)/2026, and the fuel and quarterly adjustments from NEPRA notifications up to 6 November 2026. Helplines, offices, area, network size, connection charges and net metering papers come from qesco.com.pk, checked on 14 November 2026. The PITC QESCO Web Bill was tested the same day. Recovery and loss figures come from NEPRA’s FY 2024 to 2025 report. The tubewell figures come from June 2026 press reports of QESCO’s statement. Sample bills are our estimates and leave out arrears, meter rent and income tax.

Frequently asked questions
How can I check my QESCO bill online?
Type the 14 digit reference number from any old QESCO bill in the box at the top of this page and pick U or R. The bill opens from PITC's official QESCO Web Bill, ready to download or print.
How do I get a QESCO duplicate bill without the reference number?
Switch to the Customer ID tab and enter the ID printed on the same bill. With neither number, take your CNIC and address to the QESCO customer services centre or your subdivision office.
What is the QESCO complaint number?
QESCO tells customers to call 118 or send an SMS to 8118 for electricity complaints. The head office complaint and customer services centre in Quetta Cantt also answers on 081 9201445.
How do I report electricity theft to QESCO?
Call QESCO's toll free theft line, 0800 84338, which the company lists on its website. Give the place, the feeder or pole number if you know it, and what you saw.
Which areas come under QESCO?
QESCO supplies Balochistan except District Lasbela, about 43% of Pakistan's land area by its own account. Its circles run from Quetta, Pishin and Loralai to Sibi, Khuzdar and Makran.
How much is a 300 unit QESCO bill?
A home that has lost protected status pays about Rs 14,709 for 300 units on a 2 kW load in November 2026, by our estimate. Arrears, meter rent and income tax are extra.
Last updated: