Put your 14 digit reference number in the box above and this month’s HESCO bill opens from the official PITC service. The estimator below prices any number of units at the rates notified for November 2026.
Which homes get a HESCO bill
The Hyderabad Electric Supply Company runs power distribution for the lower half of Sindh outside Karachi. Your bill’s header names the company. Only a HESCO reference number opens on the HESCO page.
Four circles, 13 districts
HESCO says it divides 13 districts of Sindh into four operation circles: Hyderabad, Laar, Nawabshah and Mirpurkhas. Your circle, division and subdivision are printed on the bill, and they decide which office handles your complaint.
| Company | Area | Online bill |
|---|---|---|
| HESCO | 13 districts of southern Sindh in four circles | PITC HESCO Web Bill |
| SEPCO | Upper Sindh around Sukkur and Larkana | PITC SEPCO Web Bill |
| K-Electric | Karachi | K-Electric’s own system |
HESCO, SEPCO or K-Electric
Upper Sindh, around Sukkur and Larkana, gets a SEPCO bill instead. Karachi is supplied by K-Electric, a private company with its own bill system. A K-Electric account number will not open on PITC.
HESCO online bill by reference number
Reading the 14 digits
| Part | Digits | What it stands for |
|---|---|---|
| Batch | 2 | The reading batch of your meter |
| Subdivision | 5 | Your HESCO subdivision |
| Reference | 7 | Your connection |
| U or R | 1 letter | Urban or rural feeder |
Read the number from the top left of an old bill. Ignore spaces and dashes on the paper. Only the 14 digits count.
Customer ID tab
Every HESCO bill also carries a Customer ID of up to 10 digits. Choose the Customer ID tab in the box and enter it. The same account opens.
“Bill not found”
A village meter searched with U, or a city meter searched with R, comes back empty. Switch the letter before you decide the number is wrong. If the bill shows last month, your batch has not been uploaded yet, so try again the next day.
This short Urdu clip from June 2026 shows the same steps on a phone, from the reference number to the downloaded bill.

HESCO duplicate bill download and print
PDF for the bank, image for the phone
Download the PDF when you plan to print or keep records. An image opens faster on a phone and is easy to send on WhatsApp. Name the file with the month, for example hesco-bill-november-2026.
Print at full size
Bank counters accept a printed duplicate bill. Print the whole page so the barcode and the reference number scan cleanly.
When the paper bill never comes
Late or missing paper bills are a complaint, not just a delay. Register it on 118 so it is on record if a late payment surcharge appears later.
HESCO bill calculator for 100 to 500 units
Hyderabad pays the same national uniform tariff as the rest of the ex WAPDA companies. A Peshawar home on a PESCO bill is charged the same slab rates. What changes a Sindh bill most is the long summer, when fans, coolers and ACs push homes over 200 units.
Protected homes
| Units | Load | Estimated bill | Per unit |
|---|---|---|---|
| 100 | 1 kW | Rs 1,871 | Rs 18.71 |
| 150 | 2 kW | Rs 3,306 | Rs 22.04 |
| 200 | 2 kW | Rs 4,270 | Rs 21.35 |
Unprotected homes
| Units | Load | Estimated bill | Per unit |
|---|---|---|---|
| 250 | 2 kW | Rs 12,395 | Rs 49.58 |
| 300 | 2 kW | Rs 14,709 | Rs 49.03 |
| 350 | 3 kW | Rs 19,000 | Rs 54.29 |
| 500 | 3 kW | Rs 28,359 | Rs 56.72 |
Our calculation from NEPRA S.R.O. 279(I)/2026, 1501(I)/2026 and 2094(I)/2026. Excludes income tax, arrears and meter rent.
Why 201 units hurts
The jump between 200 and 250 units is not the extra 50 units. It is the loss of protected status, which moves every unit to the higher rate. Keep one summer month under 200 units if you can, because one month above it costs six months of protection.
Where a 300 unit bill goes
| Line on the bill | Amount |
|---|---|
| Energy, 300 units at Rs 33.10 | Rs 9,930 |
| Fixed charge, Rs 350 per kW for 2 kW | Rs 700 |
| FC surcharge, Rs 3.23 per unit | Rs 969 |
| Quarterly adjustment, Rs 0.5194 per unit | Rs 156 |
| Fuel adjustment, Rs 2.3673 per unit | Rs 710 |
| GST at 18% | Rs 2,244 |
| Estimated total | Rs 14,709 |
HESCO unit rate for November 2026
These rates come from S.R.O. 279(I)/2026, in force since 12 February 2026.
Lifeline and protected
| Group | Units | Rate per unit | Fixed charge per kW |
|---|---|---|---|
| Lifeline | Up to 50 | Rs 3.95 | None |
| Lifeline | 51 to 100 | Rs 7.74 on all units | None |
| Protected | 1 to 100 | Rs 10.54 | Rs 200 |
| Protected | 101 to 200 | Rs 13.01 | Rs 300 |
A home is protected while it stays at 200 units or less in each of the last six months. Only protected homes get the benefit of the previous slab.
Unprotected
| Units in the month | Rate on every unit | Fixed charge per kW |
|---|---|---|
| 1 to 100 | Rs 22.44 | Rs 275 |
| 101 to 200 | Rs 28.91 | Rs 300 |
| 201 to 300 | Rs 33.10 | Rs 350 |
| 301 to 400 | Rs 36.46 | Rs 400 |
| 401 to 500 | Rs 38.95 | Rs 500 |
| 501 to 600 | Rs 40.22 | Rs 675 |
| 601 to 700 | Rs 41.85 | Rs 675 |
| Above 700 | Rs 47.20 | Rs 675 |
Load of 5 kW and above
A sanctioned load of 5 kW or more needs a time of use meter. Peak units cost Rs 46.85 and off peak units Rs 34.53, with a fixed charge of Rs 675 per kW.
Fuel adjustment and taxes on the HESCO bill
FCA of Rs 2.3673
NEPRA notified the September 2026 fuel adjustment of Rs 2.3673 per unit on 6 November 2026. It appears on the November bill and is charged on the units you used in September.
| Fuel month | Per unit | Billed in |
|---|---|---|
| June 2026 | Rs 0.7503 | August |
| July 2026 | Rs 2.0581 | September |
| August 2026 | Rs 1.1086 | October |
| September 2026 | Rs 2.3673 | November |
Quarterly adjustment and FC surcharge
A quarterly adjustment of Rs 0.5194 per unit runs on the September to November 2026 bills. The FC surcharge of Rs 3.23 per unit repays the circular debt loan. Lifeline homes pay neither.
GST and income tax
GST at 18% covers energy, the fixed charge and the adjustments. Above a Rs 25,000 bill, advance income tax can be added for anyone not on the Active Taxpayers List. The PTV fee and electricity duty no longer appear on home bills.
HESCO complaint number 118 and theft reports
Faults and billing errors
HESCO’s website shows 118 as its helpline. Call it for outages, wrong readings and billing errors, and write down the complaint number you get. The CCMS portal run by PITC and the Pakistan Citizen Portal app take complaints online too.
Reporting electricity theft
HESCO publishes three mobile numbers for confirmed reports of power theft.
| Officer | Number |
|---|---|
| Chief Internal Auditor | 0333 3700024 |
| Chief Commercial Officer | 0333 3700017 |
| Director Surveillance and Investigation | 0333 3700041 |
When HESCO does not resolve it
A billing dispute that stays open can go to NEPRA through its Asaan Approach app, which takes complaints against every distribution company. Our helplines page lists the other federal and provincial numbers.
HESCO due date and late payment
Ways to pay
Bank apps and mobile wallets list HESCO under electricity bills. Enter the reference number and check the month and amount before you confirm. Keep the receipt with the month in its name.
10% after the due date
After the due date, 10% of the bill before taxes is added.
| Sample bill | By due date | After due date |
|---|---|---|
| 150 units, protected, 2 kW | Rs 3,306 | Rs 3,586 |
| 300 units, unprotected, 2 kW | Rs 14,709 | Rs 15,956 |
| 500 units, unprotected, 3 kW | Rs 28,359 | Rs 30,762 |
HESCO net metering and new connection
Solar and net metering
HESCO sends solar applicants to the Roshan Pakistan net metering portal. New users fall under NEPRA’s prosumer rules of 2026, with exported units bought back at a lower rate. Our solar scheme guide explains the change.
New connection
HESCO takes new connection requests on the ENC portal at enc.com.pk. The demand notice HESCO issues after the site survey is the amount you actually pay.
HESCO recovery and load shedding
What NEPRA found
NEPRA’s performance report for FY 2024 to 2025 put HESCO’s bill recovery at 74.8%. The value of its distribution losses was Rs 27.14 billion, the fifth highest of any company.
- 74.8%
- Bill recovery
- Rs 27.14 billion
- Value of losses
- 4
- Operation circles
Why your feeder matters
Load shedding hours are set feeder by feeder on losses and recovery. A feeder with heavy theft and unpaid bills gets more hours, even for the homes on it that pay on time. Paying on time and reporting hooks on your feeder is the only lever a household has.
Sources and last check
Slab rates and fixed charges come from S.R.O. 279(I)/2026, and the fuel and quarterly adjustments from NEPRA notifications from 7 August to 6 November 2026. Circles, the helpline, theft report numbers, net metering and new connection come from hesco.gov.pk, checked on 12 November 2026. Recovery and loss figures come from NEPRA’s FY 2024 to 2025 performance report as reported in February 2026. Sample bills are our own estimates and leave out arrears, meter rent and income tax.

Frequently asked questions
How can I check my HESCO bill online?
Type the 14 digit reference number from an old HESCO bill in the box at the top of this page and choose U or R. The bill loads from the official PITC HESCO service, ready to save as PDF or print.
How do I get a HESCO duplicate bill without the reference number?
Use the 10 digit Customer ID printed on the same bill in the Customer ID tab. If you have neither number, take your CNIC and address to the HESCO subdivision office, which can find the account.
What is the HESCO complaint number?
Dial 118 for power failures, billing errors and meter faults, as HESCO's website shows. You can also lodge a complaint online on the CCMS portal or through the Pakistan Citizen Portal app.
Is my area under HESCO or SEPCO?
Check the company name at the top of your bill. HESCO covers 13 districts of southern Sindh in its Hyderabad, Laar, Nawabshah and Mirpurkhas circles, while SEPCO bills upper Sindh around Sukkur and Larkana.
How much is a 200 unit HESCO bill?
A protected home with a 2 kW load pays about Rs 4,270 for 200 units on the November 2026 bill by our estimate. One month above 200 units ends protected status, and the same use then costs far more.
Last updated:


