SEPCO’s bills for Sukkur, Larkana and the rest of upper Sindh load from PITC’s SEPCO Web Bill. The box above searches it with your reference number, and the estimator prices next month.
NEPRA’s official channel posted this 78 second clip in September 2024. It shows the Asaan Approach app, where a SEPCO customer can take a billing complaint the company has not settled.

SEPCO bill check by reference number
Where the 14 digits are printed
Look near the top left of any SEPCO bill. The reference number has 14 digits: batch, subdivision code and your own connection number. Spaces and dashes on the paper do not count.
| Part | Digits | Tells you |
|---|---|---|
| Batch | 2 | When your meter is read |
| Subdivision | 5 | Your SEPCO subdivision office |
| Connection | 7 | Your own meter account |
| Feeder letter | U or R | City or village feeder |
U for city, R for village
The letter after the number matters. A Larkana city meter searched with R, or a village meter searched with U, comes back as not found. Switch the letter and try again.
Customer ID tab
The Customer ID printed on the same bill opens the same account. Use it when the reference number has faded.
SEPCO online bill and duplicate copy
Download, print or share
Download a PDF to print for a bank counter. An image is lighter for WhatsApp. Print the full page so the barcode reads cleanly.
Bill still showing last month
Bills are uploaded batch by batch. If last month’s bill appears, your batch is not up yet. Check again the next day.
Paper bill never arrived
A missing paper bill does not move the due date. Download the copy here and register the delay on 118, so a later surcharge can be disputed.
SEPCO districts in upper Sindh
Districts on SEPCO’s list
SEPCO’s area of responsibility names these districts. Its About page groups them under three operation circles: Sukkur, Larkana and Dadu.
| District | Coverage |
|---|---|
| Sukkur, Ghotki, Khairpur, Kashmore Kandhkot | Whole district |
| Jacobabad, Shikarpur, Larkana, Kamber Shahdadkot, Dadu | Whole district |
| Naushahro Feroze | Whole district |
| Rahim Yar Khan (Punjab) | Part |
| Jamshoro, Shaheed Benazirabad | Part |
Where SEPCO meets HESCO
SEPCO was split from HESCO and incorporated on 23 November 2010. The two now share the border districts of Jamshoro and Shaheed Benazirabad. Homes in those districts should check the company name on the bill first. The rest of lower Sindh is on the HESCO bill, and Karachi on K-Electric.
SEPCO bill for 200, 300 and 400 units
Sukkur and Jacobabad have some of the longest, hottest summers in the country. Coolers and ACs push many homes past 200 units in those months, so the 200 unit line decides most bills.
Protected or not at 200 units
| 200 units on a 2 kW load | Estimated bill | Per unit |
|---|---|---|
| Protected home | Rs 4,270 | Rs 21.35 |
| Unprotected home | Rs 8,974 | Rs 44.87 |
One month above 200 units ends protected status for the next six months. That doubles the cost of the same 200 units.
Bigger homes
| Units | Load | Estimated bill | Per unit |
|---|---|---|---|
| 150, protected | 2 kW | Rs 3,306 | Rs 22.04 |
| 300 | 2 kW | Rs 14,709 | Rs 49.03 |
| 400 | 3 kW | Rs 21,512 | Rs 53.78 |
| 500 | 3 kW | Rs 28,359 | Rs 56.72 |
A 400 unit bill, line by line
| Line on the bill | Amount |
|---|---|
| Energy, 400 units at Rs 36.46 | Rs 14,584 |
| Fixed charge, Rs 400 per kW for 3 kW | Rs 1,200 |
| FC surcharge, Rs 3.23 per unit | Rs 1,292 |
| Quarterly adjustment, Rs 0.5194 per unit | Rs 208 |
| Fuel adjustment, Rs 2.3673 per unit | Rs 947 |
| GST at 18% | Rs 3,281 |
| Estimated total | Rs 21,512 |
SEPCO tariff for November 2026
SEPCO charges the uniform national tariff notified as S.R.O. 279(I)/2026, in force since 12 February 2026.
Slab rates
| Group | Units | Rate per unit | Fixed charge per kW |
|---|---|---|---|
| Lifeline | Up to 50 | Rs 3.95 | None |
| Lifeline | 51 to 100 | Rs 7.74 on all units | None |
| Protected | 1 to 100 | Rs 10.54 | Rs 200 |
| Protected | 101 to 200 | Rs 13.01 | Rs 300 |
| Unprotected | 1 to 100 | Rs 22.44 | Rs 275 |
| Unprotected | 101 to 200 | Rs 28.91 | Rs 300 |
| Unprotected | 201 to 300 | Rs 33.10 | Rs 350 |
| Unprotected | 301 to 400 | Rs 36.46 | Rs 400 |
| Unprotected | 401 to 500 | Rs 38.95 | Rs 500 |
| Unprotected | 501 to 700 | Rs 40.22 to Rs 41.85 | Rs 675 |
| Unprotected | Above 700 | Rs 47.20 | Rs 675 |
A sanctioned load of 5 kW or more goes on a time of use meter, at Rs 46.85 peak and Rs 34.53 off peak.
Fuel adjustment by month
| Fuel month | Per unit | Billed in |
|---|---|---|
| June 2026 | Rs 0.7503 | August |
| July 2026 | Rs 2.0581 | September |
| August 2026 | Rs 1.1086 | October |
| September 2026 | Rs 2.3673 | November |
The quarterly adjustment of Rs 0.5194 per unit stays on bills until November 2026. The FC surcharge of Rs 3.23 per unit repays the circular debt loan. Lifeline homes pay neither.
GST and lines no longer charged
GST at 18% covers energy, the fixed charge and the adjustments. Advance income tax can apply above a Rs 25,000 bill for anyone not on the Active Taxpayers List. Electricity duty and the PTV fee have gone from home bills.
SEPCO detection bills and disputes
What a detection bill is
A detection bill adds units SEPCO says were consumed but not recorded. It usually follows a meter found faulty, slow or tampered with. It appears as a separate charge on the bill.
Fewer since August 2026
SEPCO’s chief executive told the National Assembly power committee that detection bills fell 20% in August 2026 against August 2025. He linked the fall to an online system PITC introduced, as reported on 6 November 2026.
Contesting one
Ask the SEPCO subdivision for the detection report and the meter checking record in writing. If the reply does not settle it, file the dispute with NEPRA through Asaan Approach, shown in the video above.
SEPCO complaint number 118
Phone and SMS
PITC’s complaint system lists 118 for calls and 8118 for SMS. Use them for outages, wrong readings and billing errors. Write down the complaint number.
SEPCO head office
NEPRA’s orders address SEPCO’s head office at the Old Thermal Power Station, Sukkur. Billing disputes start at your subdivision office, whose name is on the bill. Our helplines page lists other public numbers.
SEPCO customers and losses
Connections on SEPCO’s books
SEPCO’s customers page lists 827,751 connections, with no date. Of these, 651,760 are running and 175,991 are disconnected.
| Category | Running | Disconnected | Total |
|---|---|---|---|
| Domestic | 537,722 | 124,040 | 661,762 |
| Commercial | 89,867 | 38,547 | 128,414 |
| Industrial | 8,582 | 5,215 | 13,797 |
| Agriculture | 3,409 | 5,933 | 9,342 |
| Others | 12,180 | 2,256 | 14,436 |
| Total | 651,760 | 175,991 | 827,751 |
Our calculation from the customer table on sepco.com.pk, checked 14 November 2026.
Recovery and the cost of losses
NEPRA’s performance report for FY 2024 to 2025 put SEPCO’s recovery at 74.2%. The value of its distribution losses was Rs 36.04 billion, behind only PESCO and QESCO. These figures were reported in February 2026.
Load management by feeder
SEPCO’s load management notice of 6 May 2026 says cuts continue on feeders with high line losses, in line with government policy. City and village feeders are grouped by category, so hours differ from feeder to feeder.
SEPCO new connection and net metering
New meter through ENC
SEPCO’s website sends new connection requests to the ENC portal and links PITC’s connection cost calculator. Our new connection guide covers documents and deposits. NEPRA’s latest review found SEPCO late on 3.56% of connections.
Solar net metering
SEPCO’s own net metering section was empty when we checked, and its menu links NEPRA’s licence list instead. New solar users fall under NEPRA’s 2026 prosumer rules, with exported units bought back at a lower rate.
SEPCO due date and late surcharge
10% after the due date
After the due date, 10% of the bill before taxes is added.
| Sample bill | By due date | After due date |
|---|---|---|
| 150 units, protected, 2 kW | Rs 3,306 | Rs 3,586 |
| 300 units, unprotected, 2 kW | Rs 14,709 | Rs 15,956 |
| 400 units, unprotected, 3 kW | Rs 21,512 | Rs 23,335 |
Paying the bill
Bank apps and mobile wallets list SEPCO under electricity bills. Check the month and amount against the copy above before you confirm.
SEPCO news this month
Independent director approved
On 11 November 2026 the Cabinet Committee on State Owned Enterprises approved an independent director for SEPCO’s board.
Sukkur streetlights
On 6 November 2026 the National Assembly power committee told SEPCO to connect Sukkur’s new streetlights without formal applications. The chief executive objected. The report added that the municipal corporation already owes SEPCO for existing streetlights.
Sources and last check
Rates come from S.R.O. 279(I)/2026, and the fuel and quarterly adjustments from NEPRA notifications up to 6 November 2026. Districts, circles, customer counts, the load notice and connection links come from sepco.com.pk, checked on 14 November 2026. The PITC SEPCO Web Bill was tested the same day. Recovery and loss figures come from NEPRA’s FY 2024 to 2025 report. News items come from reports dated 6 and 11 November 2026. Sample bills are our estimates and leave out arrears, meter rent and income tax.

Frequently asked questions
How do I check my SEPCO bill by reference number?
Enter the 14 digit reference number from an old SEPCO bill in the box at the top of this page and choose U or R. The bill loads from PITC's official SEPCO Web Bill, ready to save or print.
How can I download a SEPCO duplicate bill?
Open the bill with your reference number or Customer ID, check the name and month, then download it as PDF or an image. A printed copy is accepted at bank counters.
What is the SEPCO complaint number?
Call 118 or send an SMS to 8118, the complaint channels PITC lists for the government owned distribution companies. Keep the complaint number you receive in case the dispute reaches NEPRA.
Which districts are under SEPCO?
SEPCO lists Sukkur, Ghotki, Khairpur, Kashmore, Jacobabad, Shikarpur, Larkana, Kamber Shahdadkot, Dadu and Naushahro Feroze. It also covers parts of Rahim Yar Khan, Jamshoro and Shaheed Benazirabad districts.
What is a detection bill from SEPCO?
A detection bill charges extra units SEPCO says were used but not recorded, for example through a faulty or tampered meter. You can contest it with SEPCO and then with NEPRA.
How much is a 200 unit SEPCO bill?
A protected home on a 2 kW load pays about Rs 4,270 for 200 units on the November 2026 bill, by our estimate. Without protected status the same units cost about Rs 8,974.
Last updated: